📋 Overview

This document outlines the comprehensive plan for completing the mnemo_cards_web_v2 project. Tasks are organized by priority and dependency.


🎯 Phase 1: Complete API v2 Backend Implementation

Priority: HIGH
Estimated Time: 8-12 hours
Dependencies: None

1.1 Fix JWT Service Implementation

Status: 🔴 Critical
Time: 2-3 hours

Tasks:

  • Replace placeholder HMAC-SHA256 with proper crypto library
    • Use crypto package: package:crypto/crypto.dart
    • Implement proper HMAC-SHA256 signing
    • Add secret key management (environment variable or secure storage)
  • Test JWT token generation and verification
  • Add token expiration handling
  • Implement refresh token blacklist storage (Isar model or in-memory cache)
  • Add comprehensive error handling

Acceptance Criteria:

  • JWT tokens are properly signed with HMAC-SHA256
  • Token verification works correctly
  • Token expiration is enforced
  • Refresh tokens can be invalidated

Files to Modify:

  • mnemo_cards_backend/lib/api/v2/jwt_service.dart

1.2 Complete Authentication API v2

Status: 🟡 In Progress
Time: 2-3 hours

Tasks:

  • Verify Google OAuth flow works end-to-end
  • Add Telegram authentication endpoint (future)
  • Test token refresh mechanism
  • Add rate limiting for auth endpoints
  • Add comprehensive error responses
  • Write integration tests

Acceptance Criteria:

  • Google OAuth flow works completely
  • Token refresh works when access token expires
  • Proper error messages for all failure scenarios
  • Tests cover all auth flows

Files to Modify:

  • mnemo_cards_backend/lib/api/v2/auth_api_v2.dart

1.3 Implement Packs API v2

Status: 🟡 Partial
Time: 3-4 hours

Tasks:

  • Complete GET /api/v2/packs with proper pagination
    • Query params: ?page=1&limit=20&search=term&language=lang
    • Return paginated response: { items: [], total: 0, page: 1, limit: 20 }
  • Implement GET /api/v2/packs/{packId}
    • Return full pack details
    • Include user's purchase status if authenticated
  • Implement GET /api/v2/packs/{packId}/cards
    • Return all cards in pack
    • Support pagination if needed
  • Implement GET /api/v2/packs/{packId}/cards/{cardId}/image
    • Return card image (reuse existing v1 logic)
  • Implement GET /api/v2/packs/{packId}/tests
    • Return tests for pack
  • Add filtering and search capabilities
  • Write comprehensive tests

Acceptance Criteria:

  • All pack endpoints work correctly
  • Pagination works properly
  • Search and filtering work
  • Tests cover all endpoints

Files to Modify:

  • mnemo_cards_backend/lib/api/v2/packs_api_v2.dart

1.4 Implement Tests API v2

Status: Not Started
Time: 2-3 hours

Tasks:

  • Implement GET /api/v2/tests/{testId}
    • Return test details
  • Implement POST /api/v2/tests/{testId}/results
    • Accept test results
    • Validate results
    • Save to database
  • Implement GET /api/v2/tests/{testId}/history
    • Return user's test attempt history
    • Support pagination
  • Write tests

Acceptance Criteria:

  • All test endpoints work correctly
  • Results are properly saved
  • History is correctly retrieved
  • Tests cover all endpoints

Files to Create:

  • mnemo_cards_backend/lib/api/v2/tests_api_v2.dart

1.5 Implement Games API v2

Status: Not Started
Time: 1-2 hours

Tasks:

  • Implement GET /api/v2/games
    • Return all available games
    • Include game metadata
  • Implement GET /api/v2/games/{gameId}/assets
    • Return game assets URL/info
  • Write tests

Acceptance Criteria:

  • Games list endpoint works
  • Game assets endpoint works
  • Tests cover endpoints

Files to Create:

  • mnemo_cards_backend/lib/api/v2/games_api_v2.dart

1.6 Implement Purchases API v2

Status: Not Started
Time: 4-5 hours

Tasks:

  • Implement POST /api/v2/purchases/packs/{packId}
    • Create purchase intent
    • Return purchase info
  • Implement GET /api/v2/purchases/packs/{packId}/status
    • Check if pack is purchased
  • Implement POST /api/v2/purchases/payments
    • Create payment (YooKassa integration)
    • Return payment URL/redirect
  • Implement GET /api/v2/purchases/payments/{paymentId}/verify
    • Verify payment status
    • Update user purchases on success
  • Write tests

Acceptance Criteria:

  • Purchase flow works end-to-end
  • Payment integration works
  • Payment verification works
  • User purchases are updated correctly

Files to Create:

  • mnemo_cards_backend/lib/api/v2/purchases_api_v2.dart

1.7 Implement Subscriptions API v2

Status: Not Started
Time: 3-4 hours

Tasks:

  • Implement GET /api/v2/subscriptions/plans
    • Return available subscription plans
  • Implement POST /api/v2/subscriptions
    • Create subscription (delegate to existing logic)
  • Implement GET /api/v2/subscriptions/me
    • Get current user's subscription
  • Implement DELETE /api/v2/subscriptions/me
    • Cancel subscription
  • Write tests

Acceptance Criteria:

  • All subscription endpoints work
  • Subscription creation works
  • Cancellation works
  • Tests cover all endpoints

Files to Create:

  • mnemo_cards_backend/lib/api/v2/subscriptions_api_v2.dart

1.8 Implement Promocodes API v2

Status: Not Started
Time: 1-2 hours

Tasks:

  • Implement GET /api/v2/promocodes
    • Return available promocodes (if public)
    • Query params: ?active=true
  • Implement POST /api/v2/promocodes/{code}/apply
    • Apply promocode
    • Validate code
    • Apply discount/benefit
  • Write tests

Acceptance Criteria:

  • Promocode listing works
  • Promocode application works
  • Discounts are applied correctly
  • Tests cover endpoints

Files to Create:

  • mnemo_cards_backend/lib/api/v2/promocodes_api_v2.dart

1.9 Update Backend Routing

Status: 🟡 Partial
Time: 1 hour

Tasks:

  • Mount all v2 APIs in mnemo_shelf.dart
  • Verify v2 routes don't conflict with v1
  • Test all v2 endpoints are accessible
  • Add OpenAPI documentation for v2 endpoints

Acceptance Criteria:

  • All v2 APIs are mounted correctly
  • No route conflicts
  • All endpoints accessible

Files to Modify:

  • mnemo_cards_backend/lib/api/mnemo_shelf.dart

🎯 Phase 2: Migrate Web App to Use API v2

Priority: HIGH
Estimated Time: 6-8 hours
Dependencies: Phase 1 (at least backend auth must be working)

2.1 Complete HttpRepositoryV2 Implementation

Status: 🟡 Partial
Time: 2-3 hours

Tasks:

  • Add missing methods to HttpRepositoryV2:
    • Purchase methods (createPackPurchase, verifyPayment, etc.)
    • Subscription methods (getSubscriptionPlans, purchaseSubscription, cancelSubscription)
    • Promocode methods (getPromocodes, applyPromocode)
    • User methods (updateUserSettings, getUserPurchases, getUserStatistics)
  • Ensure all methods match API v2 endpoints
  • Add proper error handling
  • Write unit tests

Acceptance Criteria:

  • All v2 API endpoints are accessible via HttpRepositoryV2
  • Error handling is consistent
  • Tests cover all methods

Files to Modify:

  • mnemo_cards_web_v2/lib/domain/services/http_repository_v2.dart

2.2 Migrate PackManager to Use v2

Status: Not Started
Time: 1-2 hours

Tasks:

  • Update PackManager to use HttpRepositoryV2 instead of HttpRepository
  • Update method calls to use v2 endpoints
  • Update error handling
  • Write/update tests

Acceptance Criteria:

  • PackManager uses v2 API
  • All pack operations work
  • Tests pass

Files to Modify:

  • mnemo_cards_web_v2/lib/domain/services/pack_manager.dart
  • mnemo_cards_web_v2/test/domain/services/pack_manager_test.dart

2.3 Migrate GamesManager to Use v2

Status: 🟡 Partial
Time: 1 hour

Tasks:

  • Update GamesManager to use HttpRepositoryV2
  • GamesManager uses v2 API
  • Games load correctly
  • Tests pass

Files to Modify:

  • mnemo_cards_web_v2/lib/domain/services/games_manager.dart
  • mnemo_cards_web_v2/test/domain/services/games_manager_test.dart

2.4 Migrate TestManager to Use v2

Status: 🟡 Partial
Time: 1-2 hours

Tasks:

  • Update TestManager to use HttpRepositoryV2
  • TestManager uses v2 API
  • Tests load and submit correctly
  • Tests pass

Files to Modify:

  • mnemo_cards_web_v2/lib/domain/services/test_manager.dart
  • mnemo_cards_web_v2/test/domain/services/test_manager_test.dart

2.5 Migrate Other Services to Use v2

Status: 🟡 Partial
Time: 2-3 hours

Tasks:

  • Update SubscriptionService to use HttpRepositoryV2
  • Update PromocodeService to use HttpRepositoryV2
  • Update StatisticsService to use v2 (if needed)
  • Update PackProgressService to use v2 (if needed)
  • Update tests for all services

Acceptance Criteria:

  • All services use v2 API
  • All functionality works
  • Tests pass

Files to Modify:

  • mnemo_cards_web_v2/lib/domain/services/subscription_service.dart
  • mnemo_cards_web_v2/lib/domain/services/promocode_service.dart
  • Related test files

2.6 Remove V1 Dependencies

Status: Not Started
Time: 1 hour

Tasks:

  • Remove deprecated HttpRepository from dependency injection
  • Remove deprecated ApiConfig usage (or mark clearly deprecated)
  • Update all references to use v2
  • Clean up unused code

Acceptance Criteria:

  • No v1 dependencies remain in web app
  • Code is clean
  • No deprecation warnings

🎯 Phase 3: Feature Implementation

Priority: MEDIUM
Estimated Time: 12-16 hours
Dependencies: Phase 2 complete

3.1 Pack Purchase Flow

Status: Not Started**
Time: 6-8 hours

Tasks:

  • Create PurchaseService using HttpRepositoryV2
  • Implement purchase flow:
    • Check if pack is owned
    • Show "Buy Pack" button if not owned
    • Create payment via API v2
    • Handle payment redirect
    • Verify payment after return
    • Update UI to show purchased packs
  • Create purchase UI:
    • Purchase confirmation dialog
    • Payment redirect handling
    • Payment status display
  • Write unit tests
  • Write integration tests

Acceptance Criteria:

  • Users can purchase packs
  • Payment flow works end-to-end
  • UI updates correctly after purchase
  • Tests cover purchase flow

Files to Create:

  • mnemo_cards_web_v2/lib/domain/services/purchase_service.dart
  • lib/presentation/pages/purchase/purchase_page.dart (if needed)
  • lib/di/user_scope/modules/purchase_module.dart

Files to Modify:

  • lib/presentation/pages/pack_details/pack_details_page.dart
  • lib/presentation/widgets/pack_card.dart

3.2 Enhanced Subscription Management

Status: 🟡 Partial
Time: 4-5 hours

Tasks:

  • Create subscription page UI
  • Display subscription plans
  • Implement subscription purchase
  • Implement subscription cancellation
  • Show subscription status on ProfilePage
  • Add subscription benefits UI
  • Write tests

Acceptance Criteria:

  • Subscription page works
  • Purchase flow works
  • Cancellation works
  • UI displays subscription status correctly

Files to Create:

  • lib/presentation/pages/subscription/subscription_page.dart

Files to Modify:

  • lib/presentation/pages/profile/profile_page.dart
  • lib/domain/services/subscription_service.dart

3.3 Promocode UI

Status: Not Started
Time: 2-3 hours

Tasks:

  • Create promocode input widget
  • Add promocode section to ProfilePage or PurchasePage
  • Implement promocode application flow
  • Show promocode benefits/status
  • Handle promocode errors
  • Write tests

Acceptance Criteria:

  • Users can enter promocodes
  • Promocodes are applied correctly
  • Error handling works
  • UI feedback is clear

Files to Create:

  • lib/presentation/widgets/promocode_input.dart

Files to Modify:

  • lib/presentation/pages/profile/profile_page.dart

🎯 Phase 4: Quality & Testing

Priority: MEDIUM
Estimated Time: 8-10 hours
Dependencies: Phase 2-3 complete

4.1 Comprehensive Testing

Status: Not Started
Time: 6-8 hours

Tasks:

  • Write unit tests for all v2 API endpoints (backend)
  • Write unit tests for HttpRepositoryV2 (web app)
  • Write integration tests for auth flow
  • Write integration tests for pack browsing
  • Write integration tests for purchase flow
  • Write integration tests for subscription flow
  • Ensure test coverage >80% for all new code

Acceptance Criteria:

  • All new code has tests
  • Test coverage >80%
  • All tests pass

4.2 Fix Remaining Test Failures

Status: 🟡 In Progress
Time: 1-2 hours

Tasks:

  • Fix test_page_test.dart (empty file causing compilation errors)
  • Investigate other failing tests
  • Fix all test failures
  • Ensure all tests pass

Acceptance Criteria:

  • All tests pass
  • No compilation errors in tests

4.3 Code Quality Improvements

Status: Not Started
Time: 2-3 hours

Tasks:

  • Run flutter analyze and fix all warnings
  • Fix linter errors
  • Improve code documentation
  • Add JSDoc comments to public APIs
  • Refactor any complex code

Acceptance Criteria:

  • No linter warnings
  • Code is well-documented
  • Code follows project patterns

🎯 Phase 5: Additional Features (Lower Priority)

Priority: LOW
Estimated Time: 12-16 hours
Dependencies: Phases 1-4 complete

5.1 Vocabulary/Review Page

Status: Not Started
Time: 6-8 hours

Tasks:

  • Create VocabularyPage in bottom navigation
  • Fetch all learned cards across packs
  • Implement filtering by pack/language
  • Implement search functionality
  • Create review interface
  • Add export functionality
  • Write tests

Files to Create:

  • lib/presentation/pages/vocabulary/vocabulary_page.dart
  • lib/domain/services/vocabulary_service.dart
  • lib/domain/state/vocabulary_state_manager.dart
  • lib/di/user_scope/modules/vocabulary_module.dart

5.2 Settings Page

Status: Not Started
Time: 2-3 hours

Tasks:

  • Create separate SettingsPage
  • Move settings from ProfilePage
  • Add theme toggle
  • Add language selection
  • Add sound effects toggle
  • Add notifications settings
  • Implement settings persistence
  • Write tests

Files to Create:

  • lib/presentation/pages/settings/settings_page.dart
  • lib/domain/state/settings_state_manager.dart

5.3 Telegram Authentication (Code-based)

Status: 🔴 Blocked
Time: 8-10 hours

Tasks:

  • Design auth flow (code generation, validation, timeout)
  • Add backend endpoints:
    • POST /api/v2/auth/telegram/request - Request auth code
    • POST /api/v2/auth/telegram/verify - Verify code and return token
  • Update telegram bot with /auth command
  • Implement code generation and storage in bot
  • Add TelegramAuthService in web app
  • Create TelegramAuthPage UI
  • Integrate with existing AuthService
  • Add timeout handling (codes expire after 5 min)
  • Write tests

Blocker: Requires backend API endpoints and telegram bot modifications


🎯 Phase 6: Documentation & Deployment

Priority: LOW
Estimated Time: 4-6 hours
Dependencies: Phases 1-4 complete

6.1 API Documentation

Tasks:

  • Generate OpenAPI/Swagger documentation for v2
  • Document all v2 endpoints
  • Add request/response examples
  • Document authentication flow
  • Create API migration guide

6.2 Deployment Preparation

Tasks:

  • Update production API URLs
  • Configure CORS for production
  • Set up JWT secret key management
  • Test deployment to staging
  • Create deployment checklist

📊 Priority Matrix

🔴 High Priority (Complete First)

  1. Fix JWT Service crypto implementation
  2. Complete backend auth API v2
  3. Migrate web app services to use v2
  4. Implement pack purchase flow

🟡 Medium Priority (Complete Next)

  1. Complete remaining backend v2 endpoints
  2. Implement subscription management UI
  3. Comprehensive testing
  4. Fix test failures

🟢 Low Priority (Complete When Time Allows)

  1. Vocabulary/Review page
  2. Settings page
  3. Telegram authentication
  4. API documentation
  5. Deployment preparation

📈 Estimated Timeline

Phase 1 (Backend v2): 8-12 hours
Phase 2 (Web Migration): 6-8 hours
Phase 3 (Features): 12-16 hours
Phase 4 (Quality): 8-10 hours
Phase 5 (Additional Features): 12-16 hours (optional)
Phase 6 (Documentation): 4-6 hours (optional)

Total Core Work (Phases 1-4): ~34-46 hours
Total Including Optional: ~50-68 hours


🎯 Success Criteria

The project will be considered complete when:

  1. API v2 is fully implemented on backend
  2. Web app uses API v2 exclusively
  3. All core features work (auth, packs, tests, purchases, subscriptions)
  4. Test coverage >80%
  5. All tests pass
  6. No critical bugs
  7. Code follows project patterns and conventions

📝 Notes

  • Backward Compatibility: V1 APIs should remain functional for mobile app
  • Testing: Write tests as features are implemented, not after
  • Documentation: Update PROGRESS.md and TODO.md after each major task
  • Code Quality: Follow clean architecture, yx_scope, yx_state patterns
  • Web Only: Remember this is a web app - no mobile/macOS features needed

Last Updated: October 28, 2025